加强养护, 防止混凝土表面游离水蒸发过快.
互联网摘选
控制某工程混凝土现浇板温度收缩裂缝的措施
互联网摘选
Frame by frame pre-poured concrete load-bearing wall is cut off from the role.
框架结构全部由事先浇筑的混凝土框架 承重,墙只是起隔断作用.
互联网摘选
The surface of poured concrete may vary according to its finish and aggregate.
浇注混凝土的表面依照其表面抛光材料和混凝料的不同而变化.
互联网摘选
方法在预先处理过的旧混凝土表面涂刷厚度为1.5~2mm的界面剂,然后浇筑新混凝土。
互联网摘选
THe steam roller leveled off the gravel road and then the concrete was poured.
蒸气压路机先把路基的砾石整平,然后才倒下混凝土.
互联网摘选
The steamroller leveled out the gravel roadbed and then the concrete was poured.
蒸汽压路机把石子路床压平;然后注上水泥.
互联网摘选
The steamroller leveled out the gravel roadbed and than the concrete was poured.
蒸汽辗压机先把路基的沙砾辗平,然后才倒下水泥.
网络文摘精选
The steamroller levelled off the gravel roadbed and then the concrete was poured.
蒸汽压路机压平碎石路基,然后浇注混凝土.
网络文摘精选
